New homes ยท Pickering
Custom Home Building in Pickering
When renovating is not enough, we build new. One team takes the project from the lot and the first drawings to the day you get the keys. In Pickering, most of the housing is 1960s to 1990s subdivisions, with older streets near the lake.

Scope
What is included.
- Lot assessment and feasibility
- Architecture, engineering and interior design
- Demolition and building permits
- Foundations, structure and envelope
- Mechanical, electrical and interior finishes
- Final walkthrough and handover documents
Cost
What it costs.
From $330per sq ft
What moves the price
- Size and complexity of the design
- Finish level inside and out
- Site conditions, demolition and servicing
Prices are in Canadian dollars before HST, as of October 2026. Every project is confirmed with a written quote after a site visit.
Local knowledge
Custom Home Building in Pickering.
Homes like these
Post-war bungalow lots are among the most common sites for rebuilds and new custom homes.
Housing
In Pickering, most of the housing is 1960s to 1990s subdivisions, with older streets near the lake.
Permits
Building permits in Pickering are issued by the City of Pickering's building services. We prepare the drawings, submit the application and book the inspections.
Areas we cover
We work throughout Pickering, including Bay Ridges, Dunbarton, Amberlea, Liverpool and Rosebank.
Ready for renewal
Many Pickering homes still have their original kitchens, bathrooms and windows, which makes whole-home updates common.
Lakeside and valley lots
Properties near the waterfront and creek valleys can fall under conservation authority review as well as city permits.
Before you start
What to know.
Feasibility
Before design, we look at what the lot and zoning allow, what has to be demolished, and how that fits your budget.
Approvals
A new house needs zoning compliance, a demolition permit where an old house is removed, and a building permit. Some designs also need a minor variance.
One team
Design decisions and construction costs affect each other at every step. Keeping them in one team stops drawings being produced that cannot be built for the budget.
How we work
One team for every stage.
- AssessWe survey the house as it stands.
- Design and permitsDrawings and approvals before work starts.
- Strip-outWhat is worn out comes off.
- RebuildStructure, wiring, plumbing and walls.
- FinishesCabinetry, tile, floors and paint.
- HandoverWalkthrough and documents.
Questions
Custom Home Building in Pickering: the short answers.
- How much does custom home building cost in Pickering?
- With Zigma Group, custom home building starts from $330 per sq ft. Prices are in Canadian dollars before HST, as of October 2026, and are confirmed after a site visit. The main factors are size and complexity of the design; finish level inside and out; and site conditions, demolition and servicing.
- Should I renovate or rebuild?
- It depends on the condition of the existing structure, how much of the layout you want to change and what zoning allows on the lot. We assess both routes and explain the trade-offs.
- What approvals does a new custom home need?
- Zoning review, a demolition permit if an existing house is being removed, and a building permit. A minor variance is needed if the design exceeds a zoning limit.
- Do you do custom home building projects in Pickering?
- Yes. We work throughout Pickering, including Bay Ridges, Dunbarton, Amberlea, Liverpool and Rosebank. Call +1 (647) 718-3913 to arrange a visit.
- Who issues the permit for this work in Pickering?
- Where a permit is needed, it is issued by the City of Pickering's building services. We prepare the drawings and handle the application and inspections.
Book a consultation
Tell us what you want to change.
Call or email and we will arrange a visit. We work across the Greater Toronto Area and have been renovating and building homes since 2006.